Everything You Need
—All in One Single "
" Theme.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat
Search here:

PROJECTS

Safety, cost-effectiveness, and efficiency are the cornerstones of our work.

Throughout our history, we have built all kinds of projects, which serves as a testament to our commitment to our clients.

Residential / Housing

Construction Company-DIA-Costa Rica-Projects-Construction Projects_Chirca Trails

Senderos de Chircá Condominium

Owner: Desarrollos Inmobiliarios Asociados DIA S.A.
Area: 5,800 of floor space in a six-story building, including common areas and infrastructure.
Location: San Miguel de Escazú, 200 meters south of the Fresh Market.
Construction Period: 12 months (beginning in July 2021).

Construction Company-DIA-Costa Rica-Projects-Construction Projects_Novatriana Project-2

Nova Triana Condominium

Owner: Desarrollos Inmobiliarios Asociados DIA S.A.
Area: 4,719 of floor space in two 3-story buildings, common areas, and infrastructure.
Location: Alajuela, 150 m west, 100 m north, and 75 m west of the south entrance to City Mall.
Construction Period: 12 months (began in March 2021).

Altos del Monasterio | DIA Costa Rica

Altos del Monasterio Residential Condominium

Owner: CONDOMINIO EL MONASTERIO
Area: 8,000
Location: Salitral del Santa Ana
Construction Period: 13 months
Project Developed, Built, and Promoted by DIA S.A.

Scenes from Altamonte | DIA Costa Rica

Vistas de Altamonte Condominium

Owner:VISTAS DE ALTAMONTE VDA S.A.
Area: 11,500in 2 phases
Location: Granadilla de Curridabat
Construction Period: 27 months (2 phases)

Golden Hill Building - DIA Construction Company - Costa Rica - 2

Golden Hill Condominium

Owner:LLANO HERMOSO S.A.
Area: 4,000
Location: San Rafael de Escazú
Construction Period: 15 months
Project Developed, Built, and Managed by DIA S.A.

The only building in Costa Rica with a fully curved, semicircular glass window. The glass was imported from Colombia.

Casa El Monasterio | DIA Costa Rica

Altos del Monasterio Condominium Residences

Owner:CORRIENTES SERENAS S.A., MONASTERIO DEL PIACHE S.A., ROBLE DEL FARALLON S.A., LOS PINOS VERDES DE LA CALLE TRES S.A.
Area: 2,100
Location: San José
Construction Period: 16 months

Las Sardanas | DIA Costa Rica
Loma Real Pool | DIA Costa Rica
Casa Loma Real | DIA Costa Rica

Las Sardanas Condominium

Owner: Las Sardanas LS S.A.
Area: 1,200
Location: Guachipelín, Escazú
Construction Period: 8 months
Project Developed, Built, and Managed by DIA S.A.

Loma Real Condominium

Owner:MONPAR DE MARACAIBO MPMC S.A.
Area: 3,000
Location: Guachipelín, Escazú
Construction Period: 8 months
Project Developed, Built, and Managed by DIA S.A.

Infinite Terraces | DIA Costa Rica

Terrazas Infinitas Condominium

Owner: FESO de Santa Ana S.A.
Area: 8,500
Location: Guachipelín, Escazú
Construction Period: 18 months

Homes-Cerro-Tarajal-Construction Company-DIA-Costa Rica-1

4 Residences in Cerro Tarajal

Owner: 
Area:
Location:
Construction Period:

Juan-Brenes-Residence-Construction-Company-DAY-3

Residence of Mr. Juan Brenes

Owner: 
Area:
Location:
Construction Period:

About Us

Construction Company-DIA-Costa Rica-Projects-Construction Projects_North Fire Station

North Metropolitan Fire Station

Owner: Trust for the Securitization of Future Cash Flows of the Costa Rican Fire Department and the National Bank of Costa Rica
Area: 8,000
Location: San José, Calle Central between Avenida 9 and Avenida 11.
Construction Period: 18 months

Construction Company-DIA-Costa Rica-Projects-Construction Projects_South Fire Station-1

Southern Metropolitan Fire Station

Owner: Trust for the Securitization of Future Cash Flows of the Costa Rican Fire Department and the National Bank of Costa Rica
Area: 8,000
Location: San José, Avenida 18 between Calles 2 and 4.
Construction Period: 18 months

Building-Entrepreneurship-UNA-Construction Company-DIA-Costa Rica-1

UNA Lagunilla Entrepreneurship Building

Owner:
Area:m2
Location: Lagunilla de Heredia
Construction Period:
UNA project funded by the World Bank.

BIOTEC-PROTEC-Construction Company-DIA-Costa Rica-1

BIOTEC – PROTEC Buildings

Owner:
Area:
Location: ITCR Santa Clara Headquarters
Construction Period:

Residences-UNA-Construction Company-DAY-2

Student Housing with Sports Facilities at UNA’s Pérez Zeledón Campus

Owner:
Area:m2
Location: Pérez Zeledón
Construction Period:

PHOTO ONE

UNA Guanacaste Campus

Owner: U.N.A.
Area: 8,000
Location: Guanacaste
Project Duration: 12 months

CTEC | DIA Costa Rica

CTEC Costa Rican Institute of Technology

Owner: Costa Rican Institute of Technology
Area: 1,880
Location: San Carlos
Construction Period: 12 months

UCR Student Housing in Limón, DIA, Costa Rica

UCR Limón Student Housing

Owner: University of Costa Rica
Area: 1,700
Location: Limón
Construction Period: 11 months

IMAS-Liberia-Construction Company-DIA-Costa Rica

IMAS Liberia

Owner: I.M.A.S.
Area: 1,390
Location: Liberia
Construction Period: 10 months

San Ramon University Center | DIA Costa Rica

UCR San Ramón Western University Campus

Owner: University of Costa Rica
Area: 8,845
Location: San Ramón, Alajuela.
Construction Period: 15 months

Foreign Ministry Office Annex Building | DIA Costa Rica

Costa Rican Ministry of Foreign Affairs Office Annex Building

Owner:MINISTRY OF FOREIGN AFFAIRS
Area: 3,100
Location: San José
Construction Period: 10 months

UCR Library of Economic Sciences and Engineering | DIA Costa Rica

UCR Library of Economic Sciences and Engineering

Owner: University of Costa Rica
Area: 5,950
Location: Rodrigo Facio University City
Construction Period: 20 months

EARTH San Carlos Agro-Industrial School | DIA Construction Company, Costa Rica

E.A.R.T.H. University

Owner:ESCUELA TROPICO HUMEDO
Area: 3,600
Location: Limón
Construction Period: 14 months

INA La Uruca Administrative Building, San Carlos Agro-Industrial School | DIA Construction Costa Rica

INA La Uruca Administrative Building

Owner: I.N.A.
Area: 1,000
Location: La Uruca, San José
Construction Period: 9 months

CUC Cartago | DIA Costa Rica

Cartago University College

Owner:C.U.C., CARTAGO
Area: 1,100
Location: Cartago
Construction Period: 8 months

UCR School of Letters, San Carlos Agro-Industrial School | DIA Construction Company, Costa Rica

UCR College of Liberal Arts Building

Owner: University of Costa Rica
Area: 5,450
Location: Rodrigo Facio University Campus
Construction Period: 12 months

Tibas Municipality | DIA Costa Rica

Tibás City Hall

Owner: M.O.P.T.
Area: 1,526
Location: Tibás
Construction Period: 14 months

San Carlos Agro-Industrial School Cooperative Building | DIA Construction Costa Rica

Cooperative Building

Owner: UNACOOP
Area: 3,200
Location: San José
Construction Period: 8 months (Completion and Finishing Work).

CCSS Heredia Branch | DIA Construction Costa Rica

C.C.S.S. Heredia Branch

Owner: C.C.S.S.
Area: 2,050
Location: Heredia
Construction Period: 6 months

San Carlos Agro-Industrial School Scientific Research Building | DIA Construction Company, Costa Rica

Costa Rican Institute for Clinical Research

Owner: I.C.I.C., S.A.
Area: 1,500
Location: San José
Construction Period: 8 months

INA Hatillo Workshop, San Carlos Agro-Industrial School | DIA Construction, Costa Rica

I.N.A. Hatillo Workshop

Owner: I.N.A.
Area: 720
Location: Hatillo, San José
Construction Period: 6 months

INA Center for Hospitality and Tourism | DIA Construction Costa Rica

I.N.A. Hospitality and Tourism Center Building

Owner: I.N.A.
Area: 3,435
Location: San José
Construction Period: 12 months

San Carlos Agro-Industrial School | DIA Construction Costa Rica

San Carlos Agroindustrial School

Owner: M.O.P.T.
Area: 4,824
Location: San Carlos, Alajuela
Construction Period: 14 months

CNP Building, San Carlos Agro-Industrial School | DIA Construction Company, Costa Rica

C.N.P. Financial and Accounting Building

Owner: C.N.P.
Area: 1,350
Location: San José
Construction Period: 9 months

TEC Building at San Carlos Agro-Industrial School | DIA Construction Company, Costa Rica

5 Buildings, East Wing, Institute of Technology

Owner: INSTITUTO TECNOLÓGICO DE C.R.
Area: 7,650
Location: Cartago
Construction Period: 14 months

Gyms-Construction Company-DIA-Costa Rica-1

Liceo Vicente Lachner Gym

Owner:
Area:
Location:
Construction Period:

Gyms-Construction Company-DIA-Costa Rica-3

Liceo Tejar del Guarco Gym

Owner:
Area:
Location:
Construction Period:

Olympic-Swimming-Pools-Construction-Company-DIA-Costa Rica-2

Plaza González Víquez Swimming Pool

Owner:
Area:
Location:
Construction Period:
Costa Rica’s first Olympic-size swimming pools

Olympic-Swimming-Pools-Construction-Company-DIA-Costa Rica-3

UCR Swimming Pools and Sports Facilities

Owner:
Area:
Location:
Construction Period:
Costa Rica’s first Olympic-size swimming pools

Hotels & Oceanfront Condominiums

Construction Company-DIA-Costa Rica-Projects-Construction Projects_Ciudad del Mar-2

Ciudad Del Mar Condominium

Owner: Desarrollos Inmobiliarios Asociados DIA S.A.
Area: 80,000 of land for the construction of 160 homes, a recreational pool, a clubhouse, a sand court, a grass court, a tennis court, a mini-golf course, trails, a training pool, and a gym.
Location: Garabito, Jacó. 500 m south of City Hall
Project Duration: 60 months (began in May 2018)

Hidden Beach | DIA Costa Rica

Hidden Beach

Owner: Playa Escondida S.A.
Area: 6,400
Location: Herradura
Construction Period: 36 months

Hotel Pez Vela | DIA Costa Rica

Pez Vela Hotel

Owner:MARINA OCOTAL S.A.
Area: 10,000
Location: Guanacaste
Construction Period: 16 months
40 luxury cabins.

Faro-Escondido-Construction Company-DIA-Costa Rica-5

General Infrastructure Development for the Faro Escondido Tourist and Residential Complex

Owner:
Area:m2
Location: Herradura
Construction Period:

Faro V | DIA Costa Rica

Faro I and Faro V Residences

Owner: Various
Area: 8,000
Location: Herradura
Construction Period: 9 months
Several high-end homes were built.

Banks

Alajuela National Bank | DIA Construction Costa Rica

Banco Nacional, Alajuela Branch

Owner: BANCO NACIONAL DE COSTA RICA
Area: 3,500(4 levels)
Location: Alajuela
Construction Period: 17 months

Banco Nacional Pacayas | DIA Construction Costa Rica

Banco Nacional, Pacayas Branch

Owner: Banco Nacional de Costa Rica
Area: 895
Location: Pacayas, Cartago
Construction Period: 9 months

Banco de Costa Rica Grecia | DIA Construction Costa Rica

Bank of Costa Rica, Grecia Branch

Owner: Banco de Costa Rica
Area: 1,650
Location: Grecia
Construction Period: 12 months

National Bank of Uruca Construction Company DIA Costa Rica

Banco Nacional in La Uruca

Owner: BANCO NACIONAL DE COSTA RICA
Area:(4 levels)
Location: La Uruca, San José
Construction Period:

National Bank-Paraiso-Construction Company-DIA-Costa Rica

Paraíso de Cartago National Bank

Owner:
Area:
Location: Paraíso de Cartago
Construction Period:

Banco-Popular-Constructora-DIA-Costa Rica

Banco Popular on 2nd Avenue (Renovation)

Owner: Banco Popular
Area:m2
Location: San José, Costa Rica
Construction Period:

Anglo Bank-Construction Company-DIA-Costa Rica

Anglo-Costa Rican Bank

Owner: 
Area:m2 
Location: Alajuela
Construction Period:

Building-Villanueva-Construction Company-DIA

Villanueva Building

Owner: 
Area:
Location:
Construction Period:

Commercial / Industrial

Tower 8 Building | DIA Costa Rica

Oficentro Tower 8

Owner: TORRE GUATETICO DE LA VIRGEN S.A.
Area: 8,600
Location: Pavas
Construction Period: 11 months

Plaza Colonial Shopping Center | DIA Costa Rica

Oficentro Plaza Colonial Escazú

Owner:PLAZA COLONIAL DE ESCAZU
Area: 17,700
Location: San Rafael de Escazú
Construction Period: 10 months

Logic Park | DIA Costa Rica

Logic Park

Owner:FIDEDEX FIDES LTDA
Area: 9,000
Location: San Rafael, Alajuela
Construction Period: 10 months

Barranca 20MW | DIA Construction Costa Rica

Barranca 120MW Project

Owner: ALSTOM POWER RENTALS
Project Scope: Complete Infrastructure
Location: Barranca, Puntarenas
Project Duration: 4 months

ELF Oil | DIA Costa Rica

ELF Costa Rica Oil

Owner:ELF PETRÓLEO DE COSTA RICA
Area: 1,388
Location: Cartago
Construction Period: 4 months

MasXMenos NOVACENTRO | DIA Costa Rica

MasXMenos NOVACENTRO 

Owner:CORPORACION MAS X MENOS
Area: 4,000
Location: Moravia
Construction Period: 4 months

Water Supply and Sewer Systems | Constructora DIA Costa Rica

Water Supply and Sewer Systems

Owner: Water and Sewer Systems
Scope: Sanitation works in Cartago Centro, San Rafael de Oreamuno, and El Guarco
Location: Cartago
Project Duration: 14 months
Project executed in a consortium with UPACA (Peruvian company) and CPM (Costa Rican company).

Extension-Poliducto-Recope-DIA-Costa Rica

Extension of RECOPE Multipipe Lines

Owner: RECOPE
Project Scope: Civil infrastructure for the relocation of the Limón pipeline between the refinery and RECOPE’s dock in Moín.
Location: Limón
Execution Period: 12 months

JASEC San Carlos Agro-Industrial School | DIA Construction Company, Costa Rica

Tomas and Canales Birrís 

Owner: JASEC (CONSORTIUM PROJECT)
Area: 13,000
Location: Cartago
Construction Period: 17 months
DIA S.A. served as the managing company of the GUIFEDI consortium
Partner Companies: GUIFEDI Feluco Herrera S.A. and Guinand S.A. (Venezuela).

JAPDEVA Auto Repair Shop, San Carlos Agro-Industrial School | DIA Construction Company, Costa Rica

JAPDEVA Auto Repair Shop

Owner: JAPDEVA
Area: 2,352
Location: Limón
Construction Period: 6 months

VICESA Glass Factory, San Carlos Agro-Industrial School | DIA Construction Company, Costa Rica

VICESA Glass Factory

Owner:VIDRIERA CENTROAMERICANA
Area: 8,000
Location: Cartago
Construction Period: 9 months

RECOPE San Carlos Agro-Industrial School | DIA Construction Company, Costa Rica

RECOPE Tank Maintenance

Owner: RECOPE
Scope: Construction, retrofitting, and waterproofing of the dikes for three tanks at the RECOPE Refinery.
Location: Limón
Project Duration: 18 months
Project executed in a joint venture with PIMESA and Corporación Eléctrica Osmín Vargas.

Mountain Projects

Sierra Verde | DIA Costa Rica

Sierra Verde

Owner: SIERRA VERDE LA MONTAÑA S.A.
Location: Heredia
Construction Period: 11 months
Agricultural plots in perfect harmony with nature.

Monte Lagos | DIA Costa Rica

Monte Lagos

Owner:CIPRES LORITO DE COSTA RICA
Area: 10,000
Location: Barva, Heredia
Construction Period: 22 months
Complete project consisting of 20 cabins and a clubhouse with all amenities.

Miralvalle | DIA Costa Rica

Miralvalle Residential Complex

Owner: MIRALVALLE DEL NORTE S.A.
Location: Heredia
Construction Period: 14 months
Project involving ___ agricultural plots.

Switzerland | DIA Construction Costa Rica

La Suiza Residential Complex

Owner: INVERSIONES COMERC. DEL MOMENTO UNO S.A.
Location: Santa Bárbara de Heredia
A round-log construction system developed by Constructora DIA S.A. was used.

Four Properties | DIA Construction Costa Rica

Four Farms in Guararí

Owner: Various
Area: 28,000
Location: Santa Bárbara de Heredia
Construction Period: 5 months

La Catarata | DIA Construction Costa Rica

Recrero's House at La Catarata

Owner: LA CATARATA DE LA MONTAÑA DEL NORTE EN HEREDIA S.A.
Area: 350
Location: Santa Bárbara de Heredia
Construction Period: 11 months
An exemplary wood-based construction project.

Casa-Montana-Cedro-Construction-Company-DIA-Costa Rica-10

Casa del Cedro

Owner:
Location:
Area:
Construction Period:

Tarvicio-Construction Company-DIA-Costa Rica

Tarvicio Residential Complex

Owner:
Location: Sacramento, Heredia.
Area:
Construction Period:

Affordable Housing

Social-Housing-Construction-Company-DIA-Costa Rica-5

González Angulo

Owner:
Area:m2
Location:
Construction Period:

Social-Housing-Construction-Company-DIA-Costa Rica-2

White Horse

Owner:
Area:m2
Location:
Construction Period:

Social-Housing-Construction-Company-DIA-Costa Rica-1

The Union of Carthage

Owner:
Area:m2
Location:
Construction Period:

Social-Housing-Construction-Company-DIA-Costa Rica-3

Asís Neighborhood

Owner:
Area:m2
Location:
Construction Period:

Social-Housing-Construction-Company-DIA-Costa Rica-7

Bartolo Cruz Residential Complex

Owner:
Area:m2
Location:
Construction Period:

Social-Housing-Construction-Company-DIA-Costa Rica-8

The Pitaya

Owner:
Area:m2
Location:
Construction Period:

North Metropolitan Fire Station

Southern Metropolitan Fire Station

Nova Triana Condominium

Senderos de Chircá Condominium

Ciudad Del Mar Condominium

Pez Vela Tourist Resort

Faro I and Faro V Residences

Playa Escondida Private Resort Complex

Terrazas Infinitas Condominium

The Sardanas

La Catarata Recreation Center

Miralvalle Residential Complex

Scientific Research Building

House in El Cedro

Golden Hill Residential Condominium

La Suiza Residential Complex

Monte Lagos, Sacramento, Heredia

RECOPE

Click to view full size

5 Buildings at the ITCR

Alstom Power Rentals – ICE 120 MW Thermal Power Generation Project

Cartago 3-City Aqueduct

4 Luxury Residences in the El Monasterio Condominium

Altos del Monasterio Condominium

ICIC Scientific Research Building

4 Cerro Tarajal Residences

Roof Replacement and Dike Construction at the RECOPE Limón Facility

Ofibodegas Logic Park

JAPDEVA Auto Repair Shop

JASEC Water Intakes and Canals in Birrís, Cartago

EARTH Complex

Plaza Colonial Shopping Center

UNA Lagunilla Entrepreneurship Building

BIOTEC – PROTEC ITCR Buildings, Santa Clara Headquarters

Vistas de Altamonte Condominium

UNA Perez Zeledón Student Housing with Sports Facilities

CTEC

Residence of Mr. Juan Brenes

Faro Escondido Tourism Development